Comercial Urbanización Don Bosco Panama | Rental of Bodega / ofibodega in industrial park
Published
20/06/2024
Location
Urbanización Don Bosco
Price/m² of construction
B/.10.00
Price/m² of land
B/.10.00
m²
1249
Age
2024
Benefits
Water Tank
Near Traffic
Guest Parking
24 hour Security
Handicap access
Pet Friendly
Details
Logistics loading center and warehouses in Panama. With a strategic location in the so-called Zone One, Sector Industrial Park, right in front of the Don Bosco urbanization, side to the South Corridor.
Total length of the galleys: 76 meters
Width of the galleys: 15 meters
Highest part of the galley: 9.11 meters
Lower part of the galley: 8.07 meters
Mezzanine base to ceiling: 2.40 meters
Features:
Spacious storage space. Bathroom facilities. Skylights on the roof that will help
maintain a naturally illuminated area. They include 3 sectional doors, 2 for containers and 1 for personnel.
The perimeter walls of the galleys go from slab to ceiling, bottom and top with thermos sandwich panel
Acoustic. Filling block and reel on both sides. It is delivered with spray systems and electrical outputs.
Container loading and discharge platforms. Parkings in the walking area in front of each galley.
All wineries have mezanine for multiple use.
It has three-phase electricity.
Instant delivery!
Advantages of our business infrastructure:
Garita 24/7 Access Control Parkings
Water reserve
500 mts from Tocumen International Airport Entrance to and from the South Corridor
Total length of the galleys: 76 meters
Width of the galleys: 15 meters
Highest part of the galley: 9.11 meters
Lower part of the galley: 8.07 meters
Mezzanine base to ceiling: 2.40 meters
Features:
Spacious storage space. Bathroom facilities. Skylights on the roof that will help
maintain a naturally illuminated area. They include 3 sectional doors, 2 for containers and 1 for personnel.
The perimeter walls of the galleys go from slab to ceiling, bottom and top with thermos sandwich panel
Acoustic. Filling block and reel on both sides. It is delivered with spray systems and electrical outputs.
Container loading and discharge platforms. Parkings in the walking area in front of each galley.
All wineries have mezanine for multiple use.
It has three-phase electricity.
Instant delivery!
Advantages of our business infrastructure:
Garita 24/7 Access Control Parkings
Water reserve
500 mts from Tocumen International Airport Entrance to and from the South Corridor