Apartments in La Altagracia | Tourist Apartments with access to Private Beach, Punta Cana
Location
La Altagracia
Published
03/05/2024
Price/m² of construction
$1,833
Details
AE #3130
Near
20 minutes from Punata Cana International Airport
17 minutes from Blue Mall
10 minutes from Downtowm Punta Cana
3 minutes Silver Whise Sands
10 minutes Coco Bongo
Types
First, second and third level
Living/dining room
Study
Kitchen
Main room with bathroom and walking closet
Two full bathrooms
Washing area
Penthouse First Level
Living/dining room
Study
Kitchen
Main room with bathroom and walking closet
Three bathrooms
Washing area
Second level
Picuzzi
BBQ module
Bathroom
Terrace
Benefits of investing in this project
Private access to the beach
Swimming pool beach
Pool for children
Picuzzi
Gym equipped
Lobby double height
Park
Area of children
Multitasking Room
Access control
Volleyball court
Area BBQ
Gazebo
Closed project
Elevator
Terrace
Security 24 hours
106 parks
Includes air conditioning in the room
Payment plan
Reserve USD$ 3,000
10% to the contract signature
40% during construction
50 to the delivery of the property
Date of delivery December 2026
Near
20 minutes from Punata Cana International Airport
17 minutes from Blue Mall
10 minutes from Downtowm Punta Cana
3 minutes Silver Whise Sands
10 minutes Coco Bongo
Types
First, second and third level
Living/dining room
Study
Kitchen
Main room with bathroom and walking closet
Two full bathrooms
Washing area
Penthouse First Level
Living/dining room
Study
Kitchen
Main room with bathroom and walking closet
Three bathrooms
Washing area
Second level
Picuzzi
BBQ module
Bathroom
Terrace
Benefits of investing in this project
Private access to the beach
Swimming pool beach
Pool for children
Picuzzi
Gym equipped
Lobby double height
Park
Area of children
Multitasking Room
Access control
Volleyball court
Area BBQ
Gazebo
Closed project
Elevator
Terrace
Security 24 hours
106 parks
Includes air conditioning in the room
Payment plan
Reserve USD$ 3,000
10% to the contract signature
40% during construction
50 to the delivery of the property
Date of delivery December 2026