Publish Ad Publish Ads
Share this ad

Pococí | 11 HA in front of the beach and canals, to be developed in Tortuguero

Price
$1,300,000
Lot Size in m²
110000

Pococí | 11 HA in front of the beach and canals, to be developed in Tortuguero

Location

Pococí

Published

12/12/2022

Price/m² of land

$11.81

Benefits

Ocean View
Ocean Waterfront
River Waterfront
Plane

Details

Partially titled construction 11 ha Luxury Boutique Hotel Project or wellness project in Tortuguero National Park and Barra de Colorado Wildlife Refuge, Limón Province, Costa Rica. This region is part of the 5 most sought after tourist destinations in Costa Rica to visit.
The property, with a total area of 112,955 m2 (11.2 hectares) and rectangular in shape, is limited by the Caribbean Sea to the East, the Canal Caño Palma to the West, and undeveloped properties to the North and South. It extends in a rectangular space 200 meters wide by 650 meters long, bounded by the Caribbean Sea beach at one end (East Orientation) and the Caño Palma channel at the other (West Orientation).

Facing an extensive and virgin natural channel, surrounded by tropical jungle, and separated from the sea only by a narrow peninsula of virgin and intact tropical forest. The tranquility of the water and the area will bring lots of wildlife to the property. Surrounded by three Sea Turtle conservation projects, 2,400 hectares of Biological Reserve and a labyrinth of rivers and swamps.

• The original idea of the owners was to develop an Eco-Tourist Hotel project on the farm that is offered. Priceless titled property of 5000 meters between the canal and the ocean.
• Therefore, if you are interested in acquiring the land, the owners offer you, free of charge and as part of a "purchase package", to assign the legal rights acquired for the development of the project, as well as all the documentation with which it is currently counted
• This project could be the Flagship of the Tortuguero region, with chain or franchise potential.
• However, for health reasons they could not complete their hotel project, even with most of the studies, permits and construction plans. That is why we will present below information on the sale of the farm, also contemplating the sale of studies, analysis, permits, construction plans and other instruments.
• Already having most of the studies, permits and construction plans in the permit process, partially turnkey.